首页> 外国专利> Job scheduling system, job scheduling method, and job scheduling device

Job scheduling system, job scheduling method, and job scheduling device

机译:作业调度系统,作业调度方法和作业调度装置

摘要

[Problem] To provide a job scheduling system, a job scheduling method, and a job scheduling device, which can be used for replanning a plurality of jobs. [Solution] The present invention is provided with: a generation unit for identifying sequential relations of each of a plurality of jobs from history information including temporal information indicating the times at which the respective jobs have been initiated and including access information indicating that a file was referenced or updated in each of the jobs, for identifying, among the subsequent jobs between a job that is regarded as an origin job in which the file was updated and a terminal job that is the most recent job in which the file was further updated, a job in which the file was referenced, for setting degrees of influence in accordance with the identified job, and for generating a schedule plan in which the degrees of influence are incorporated; and an output unit that outputs the schedule plan.
机译:[问题]提供一种作业调度系统,作业调度方法和作业调度装置,其可用于重新计划多个作业。 [解决方案]本发明具有:生成单元,用于从历史信息中识别多个作业中的每一个的顺序关系,该历史信息包括指示各个作业已经被启动的时间的时间信息,并且包括指示文件已被启动的访问信息。在每个作业中引用或更新,以在随后的作业之间标识被更新文件的原始作业和作为文件被进一步更新的最新作业的终端作业之间的后续作业,引用文件的作业,用于根据所标识的作业设置影响程度,并生成包含影响程度的计划计划;输出单元,其输出计划计划。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号