ENVIRONMENTAL LOAD ARITHMETIC PROGRAM FOR CONSTRUCTION WORK, RECORDING MEDIUM, ENVIRONMENTAL LOAD ARITHMETIC UNIT FOR CONSTRUCTION WORK, AND CONSTRUCTION WORK MANAGEMENT SYSTEM

机译:建筑工程环境负荷算术程序,记录介质,建筑工程环境负荷算术单位和工程管理系统

摘要

PPROBLEM TO BE SOLVED: To allow management of various construction works by using integrated information using generally spreading standard methods of measurement for construction works, depletion expenses tables, material information, etc. to preliminarily calculate the amount of COSB2/SB-NOx discharged from operation machines and the like in a civil engineering work and determining a target value according with a reduction plan based on the calculation result to reflect it on the preparation of a construction schedule. PSOLUTION: A construction work management system (S) includes an integration system (1), an environmental load operation system (2), and a construction schedule preparation system (3). The environmental load operation system (2) includes a machine operation time totalizing part (20), a daily operation conversion part (21), a COSB2/SB-NOx discharge calculation part (22), a reduction target value setting part (24) for setting the target value according with the reduction plan of COSB2/SB-NOx discharge, a construction work cost calculation part (25) for calculating the cost of the construction work after the reduction plan, and a machine operation time calculation part (26) for calculating total operation times per machine type after the reduction plan. Values operated by the machine operation time calculation part (26) are reflected on construction schedule data prepared by the construction schedule preparation system (3). PCOPYRIGHT: (C)2009,JPO&INPIT
机译:

要解决的问题:通过使用综合信息来管理各种建筑工程,这些信息使用一般分散的建筑工程标准测量方法,消耗费用表,材料信息等来初步计算CO 2的量 -NOx从土木工程作业中的操作机等排出,并基于计算结果根据减少计划确定目标值,以将其反映在施工进度表的编制中。

解决方案:建筑工程管理系统(S)包括集成系统(1),环境负荷操作系统(2)和工程进度准备系统(3)。环境负荷操作系统(2)具有机械运转时间累计部(20),日运转转换部(21),CO 2 SB-NOx排出量计算部22,还原目标。用于根据CO 2 -NOx排放量的减少计划来设定目标值的值设定部(24),用于计算减少后的建造工程的成本的建造工程成本计算部(25)。计划,以及机器运行时间计算部分(26),用于计算缩减计划之后每种机器类型的总运行时间。由机器运转时间计算部(26)运算的值反映在由施工计划准备系统(3)准备的施工计划数据上。

版权:(C)2009,日本特许厅&INPIT

著录项

  • 公开/公告号JP2008293443A

    专利类型

  • 公开/公告日2008-12-04

    原文格式PDF

  • 申请/专利权人 KOSUGI DENZABURO;YAMADA RYOKO;

    申请/专利号JP20070140891

  • 发明设计人 KOSUGI DENZABURO;YAMADA RYOKO;

    申请日2007-05-28

  • 分类号G06Q50;

  • 国家 JP

  • 入库时间 2022-08-21 19:40:39