首页> 外文会议>4th International Pipeline Conference, Sep 30-Oct 3, 2002, Calgary >HIGH TEMPERATURE INSULATED COATING AND CONSTRUCTION METHODOLOGY FOR THE MACKAY RIVER PIPELINE
【24h】

HIGH TEMPERATURE INSULATED COATING AND CONSTRUCTION METHODOLOGY FOR THE MACKAY RIVER PIPELINE

机译:麦凯河管道的高温绝缘涂层和施工方法

获取原文
获取原文并翻译 | 示例

摘要

Continued development of the oilsands in the Fort McMurray area of Alberta lead to a need for the MacKay River Pipeline. This heavy oil pipeline provides long-term, cost-effective transportation for production from the MacKay River area. The pipeline is designed to transport bitumen with little or no dilution (dry bitumen). In order to operate without diluent, the bitumen must be heated. Heat must be retained using a continuous layer of insulation, which ensures that viscosity remains low. The high operating temperature and the environment, through which the pipeline passes, were major challenges encountered during the design and construction phases. This paper focuses on the design, selection criteria, and testing of the coating system and discusses the important aspects of construction.
机译:艾伯塔省麦克默里堡地区油砂的不断开发导致对麦凯河管道的需求。这条重油管道可为MacKay River地区的生产提供长期,经济高效的运输。管道设计用于运输很少或没有稀释的沥青(干沥青)。为了在没有稀释剂的情况下运行,必须加热沥青。必须使用连续的绝缘层来保留热量,以确保粘度保持较低。在设计和施工阶段遇到的主要挑战是高温,高温和管道通过的环境。本文着重于涂料体系的设计,选择标准和测试,并讨论了施工的重要方面。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号