首页> 外文会议>International pipeline conference >HIGH TEMPERATURE INSULATED COATING AND CONSTRUCTION METHODOLOGY FOR THE MACKAY RIVER PIPELINE
【24h】

HIGH TEMPERATURE INSULATED COATING AND CONSTRUCTION METHODOLOGY FOR THE MACKAY RIVER PIPELINE

机译:Mackay河管道的高温绝缘涂层及施工方法

获取原文

摘要

Continued development of the oilsands in the Fort McMurray area of Alberta lead to a need for the MacKay River Pipeline. This heavy oil pipeline provides long-term, cost-effective transportation for production from the MacKay River area. The pipeline is designed to transport bitumen with little or no dilution (dry bitumen). In order to operate without diluent, the bitumen must be heated. Heat must be retained using a continuous layer of insulation, which ensures that viscosity remains low. The high operating temperature and the environment, through which the pipeline passes, were major challenges encountered during the design and construction phases. This paper focuses on the design, selection criteria, and testing of the coating system and discusses the important aspects of construction.
机译:艾伯塔省麦克马雷堡地区的油脂持续发展导致麦田河管道。这种重油管线为麦田河区生产长期,经济高效的运输。管道设计用于运输沥青,很少或没有稀释(干沥青)。为了在没有稀释剂的情况下进行操作,必须加热沥青。必须使用连续的绝缘层保留热量,这确保了粘度仍然低。管道通过的高工作温度和环境,在设计和施工阶段期间遇到的主要挑战。本文重点介绍了涂层系统的设计,选择标准和测试,并讨论了建设的重要方面。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号