DIABLO CANYON POWER PLANT INSIGHTS FROM APPLICATION OF USNRC INTERIM STAFF GUIDANCE

机译:通过USNRC临时工作人员指导对Diablo峡谷电厂的了解

获取原文
获取原文并翻译 | 示例

摘要

Diablo Canyon Power Plant (DCPP) is replacing the existing digital Westinghouse Eagle 21rnProcess Protection System (PPS) to address obsolescence and maintenance issues. The Eaglern21 system was installed in 1994 to replace the original analog Westinghouse Hagan 7100 PPS.rnThe Nuclear Regulatory Commission (NRC) has designated the License Amendment Requestrn(LAR) for the DCPP PPS replacement project as the pilot application for use of Digital I&Crn(DI&C) Interim Staff Guidance (ISG)-06, Licensing Process. ISG-06 describes the licensingrnprocess guidance the NRC staff may use to review the LAR for a DI&C modification. Thisrnpaper describes PG&E participation in ISG-06 development along with the process used tornprepare the LAR, which is currently under Staff review.rnUSNRC Digital I&C (DI&C) Interim Staff Guidance (ISG) document ISG-02 describesrnacceptable methods for implementing diversity and defense-in-depth (D3) in digital I&Crnreactor protection system designs to mitigate the potential for a common-cause failure (CCF)rnthat would disable redundant protection system channels and prevent FSARU Chapter 15rnacceptance criteria from being met. The USNRC has approved the Topical Report for the PPSrnReplacement D3 design, which conforms to the guidance of ISG-02 Positions 1 & 2 without arnDiverse Actuation System (DAS) by providing automated, independent, and diverse backup.rnThis paper describes PG&E participation in the ISG-02 development process as well as thernevolution of the PPS replacement D3 design.rnDI&C ISG-04, Highly-Integrated Control Rooms—Communications Issues (HICRc), addressesrnissues related to interactions among safety divisions and between safety-related equipment andrnequipment that is not safety-related. The DCPP PPS replacement does not allowrncommunications between safety divisions, but does utilize communications between safetyrelatedrnequipment and equipment that is not safety-related for maintenance and TechnicalrnSpecification mandated testing. This paper describes measures taken by PG&E to justify thisrnexception to Position 10 of DI&C ISG-04.
机译:暗黑破坏神峡谷发电厂(DCPP)取代了现有的数字西屋鹰21号过程保护系统(PPS),以解决过时和维护问题。 Eaglern21系统于1994年安装,以替代原始的模拟西屋Hagan 7100 PPS。核管理委员会(NRC)已指定DCPP PPS替换项目的许可证修改请求(LAR)作为使用数字I&Crn(DI&C )临时员工指南(ISG)-06,许可流程。 ISG-06描述了NRC工作人员可用来审查LAR进行DI&C修改的许可过程指南。这篇文章描述了PG&E参与ISG-06开发以及用于准备LAR的过程,该过程目前正在接受员工审查.USNRC数字I&C(DI&C)临时员工指南(ISG)文件ISG-02描述了实现多样性和防御的可接受方法I&C反应器保护系统设计中的深度(D3),以减轻潜在的常见原因故障(CCF)rn,这会禁用冗余保护系统通道并阻止满足FSARU第15章接受标准。 USNRC已批准PPSrnReplacement D3设计的专题报告,该报告通过提供自动化,独立且多样化的备份,符合ISG-02位置1和2(无arnDiverse致动系统(DAS))的指导。 ISG-02开发过程以及PPS替代D3设计的革新。rnDI&C ISG-04,高度集成的控制室—通讯问题(HICRc),解决了与安全部门之间以及与安全相关的设备和非装备之间的交互作用相关的问题。与安全有关。更换DCPP PPS不允许在安全部门之间进行通信,但会利用与安全相关的设备与与维护和技术规范规定的测试不安全相关的设备之间的通信。本文介绍了PG&E采取的措施,以证明该例外是DI&C ISG-04的第10位。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号