首页> 外文会议>International Conference on Enhanced Building Operations; 20061106-08; Shenzhen(CN) >A Case Study of Retro Commissioning in a Standard Commercial Office Building in Japan
【24h】

A Case Study of Retro Commissioning in a Standard Commercial Office Building in Japan

机译:日本标准商业办公楼复古调试案例研究

获取原文
获取原文并翻译 | 示例

摘要

This paper describes retro commissioning of a standard commercial office building in Japan. The owner's expectations for retro commissioning are realization of energy and cost savings, and controlling the increase in electric power demand, while continuing use of most existing equipment, and maintenance of high efficiency operation. First, the performance of the existing equipment was checked using the BEMS during retro commissioning program phase. Next, optimal selection of a system and heat source equipment was performed using the simulation in the design phase. Furthermore, the verification of the performance of the refrigeration machine installed was carried out as a Functional Performance Test. And the economic effect by a repair work was verified during the operation phase. The simple payback of the project was about six years.
机译:本文介绍了日本标准商业办公楼的复古调试。业主对重新调试的期望是实现能源和成本节约,并控制电力需求的增长,同时继续使用大多数现有设备,并维持高效运行。首先,在后期调试计划阶段,使用BEMS检查了现有设备的性能。接下来,在设计阶段使用仿真对系统和热源设备进行了最佳选择。此外,作为功能性能测试对安装的制冷机的性能进行了验证。并在操作阶段验证了维修工作的经济效果。该项目的简单投资回收期约为六年。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号