首页> 外文会议>ITA general Assembly >Synthetical Analysis on Monitoring of Wushaoling Railway Tunnel
【24h】

Synthetical Analysis on Monitoring of Wushaoling Railway Tunnel

机译:武术铁路隧道监测的综合分析

获取原文

摘要

Wushaoling railway tunnel, the longest single-track railway tunnel in China, is the key project of Lanzhou-xinjiang railway line. It goes through four regional faults (F4-F7). The geological and geostress conditions are quite complicated. According to the characteristics of soft rock tunnel with large deformation on complicated stress condition, comprehensive monitoring is executed in construction of Wushaoling tunnel. Based on the measured results of the crown settlement, the horizontal convergence, the axial force of rock bolt, the surrounding rock pressure, the stress in steel set, the stress in shotctete and the stress and pressure in the secondary lining, the relation between surrounding rock pressure and displacement, the distribution rule of displacement, the coefficient of lateral pressure, the shared ratio of secondary lining pressure, the construction time of secondary lining etc, are analysed in this paper. The above information is feedback to the construction in time. The structure stability is analysed and the corresponding measures are adopted. It can also provide the numerical coefficients for data simulation and theoretical analysis. It is proved that the effect is reliable, the surrounding rock is stable and the structure is in good condition, providing a reliable technical guarantee for the perforation of the section.
机译:武士铁路隧道是中国最长的单轨铁路隧道,是兰州 - 新疆铁路线的重点项目。它经历了四个区域故障(F4-F7)。地质和根本条件非常复杂。根据软岩隧道的特点,具有大变形对复杂应力条件,在武术隧道建设中执行综合监测。基于冠沉降的测量结果,水平收敛性,岩石螺栓的轴向力,周围岩石压力,钢结构应力,射击压力和次级衬里中的应力和压力,周围的关系本文分析了岩石压力和位移,位移分配规则,横向压力系数,二次衬里压力的共用比,二次衬里等的施工时间。上述信息在时间内反馈到施工。分析结构稳定性,采用相应的措施。它还可以提供数据仿真和理论分析的数值系数。事实证明,效果可靠,周围岩石是稳定的,结构状况良好,为截面的穿孔提供可靠的技术保证。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号