【24h】

Synthetical Analysis on Monitoring of Wushaoling Railway Tunnel

机译:乌鞘岭铁路隧道监测综合分析。

获取原文
获取原文并翻译 | 示例

摘要

Wushaoling railway tunnel, the longest single-track railway tunnel in China, is the key project ofrnLanzhou-xinjiang railway line. It goes through four regional faults (F4-F7). The geological andrngeostress conditions are quite complicated. According to the characteristics of soft rock tunnel withrnlarge deformation on complicated stress condition, comprehensive monitoring is executed inrnconstruction of Wushaoling tunnel. Based on the measured results of the crown settlement, thernhorizontal convergence, the axial force of rock bolt, the surrounding rock pressure, the stress in steelrnset, the stress in shotctete and the stress and pressure in the secondary lining, the relation betweenrnsurrounding rock pressure and displacement, the distribution rule of displacement, the coefficient ofrnlateral pressure, the shared ratio of secondary lining pressure, the construction time of secondary liningrnetc, are analysed in this paper. The above information is feedback to the construction in time. Thernstructure stability is analysed and the corresponding measures are adopted. It can also provide thernnumerical coefficients for data simulation and theoretical analysis. It is proved that the effect isrnreliable, the surrounding rock is stable and the structure is in good condition, providing a reliablerntechnical guarantee for the perforation of the section.
机译:乌鞘岭铁路隧道是中国最长的单线铁路隧道,是兰新铁路的重点工程。它经历了四个区域性断裂(F4-F7)。地质和地应力条件十分复杂。结合乌鞘岭隧道在复杂应力条件下变形大的特点,对隧道进行了综合监测。根据测量结果的冠沉降,水平收敛,锚杆的轴向力,围岩压力,钢骨应力,喷丸应力和二次衬砌的应力和压力,围岩压力与围岩的关系。分析了位移,位移分布规律,侧向压力系数,二次衬砌压力的分担比,二次衬砌的施工时间等。以上信息及时反馈给施工人员。分析了结构的稳定性,并采取了相应的措施。它还可以为数据模拟和理论分析提供数值系数。实践证明,该方法效果可靠,围岩稳定,结构状况良好,为断面射孔提供了可靠的技术保证。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号