EXTENDING THE IN-LINE INSPECTION INTERVAL FOR A GAS PIPELINE USING DIRECT ASSESSMENT

机译:使用直接评估扩展燃气管道的线路检查间隔

获取原文

摘要

RWE npower own and operate a 12km long 8" diameter natural gas pipeline that supplies natural gas from the National Transmission System (NTS) to a CHP unit. The pipeline has a nominal wall thickness of 6.35mm, is constructed from API 51 X42 grade steel and has a maximum operating pressure of 75barg. The pipeline was commissioned about 8 years ago and has been operating safely since that time. The pipeline was designed in accordance with BS 8010 Parts 1 and 2, with consideration given to the Institute of Gas Engineers Recommendations, IGE/TD/1, IGE/TD/9 and IGE/TD/12. One of the requirements of IGE/TD/1 is that the time interval between in-line inspections should not normally exceed 10 years. However, IGE/TD/1 Edition 4 allows the time interval to be exceeded if justification can be demonstrated using risk based techniques. For older pipelines it is often possible to determine the required time dependent failure probability based on the results of previous ILIs. This allows the time to next ILI to be determined. This time will depend on what has been found previously and values of other pipeline parameters. However, in the case of this pipeline there are no previous ILI data. In view of the above a probabilistic approach to External Corrosion Direct Assessment (ECDA) was adopted. The method makes use of the results from the above ground surveys rather than ILI data. However, in this instance, rather than being used to determine the time interval to the next above ground survey the method was used to determine the time interval to the next (first) ILI. The method is based on structural reliability analysis (SRA) which is used to determine the time dependent probability of failure based on available data. In view of the quantity and quality of the available above ground survey data it was possible to use the method to extend the time to the next ILL by several years.
机译:RWE npower公司拥有并运营一个12公里长8" 直径的天然气管道,从国家传输系统供应天然气(NTS)的CHP单元,管道具有6.35毫米的标称壁厚,从API 51 X42级钢制成并具有75barg的最大工作压力,管道8年前被委托有关自那时以来,已安全运行,管道的设计符合BS 8010个第一和第二部分,以给天然气工程师建议研究所考虑,IGE / TD / 1,IGE / TD / 9和IGE / TD / 12。其中一个IGE / TD / 1的要求是,之间的时间间隔的在线检查通常不应超过10年。然而,IGE / TD / 1版4允许如果理由可以使用基于风险的技术来证实被超过的时间间隔。对于较旧的管线,通常可以以基于先前ILIS的结果所需要的时间依赖的失效概率。这允许时间要确定下一个ILI。这个时间将取决于之前已经等管道参数值和发现。然而,这条管线的情况下,有没有以前的ILI数据。鉴于上述概率方法为外部腐蚀直接评估(ECDA)通过。该方法利用从上述地面调查而非ILI数据的结果。然而,在这种情况下,而不是被用来确定时间间隔到下一个上述地面调查所用的方法,以确定的时间间隔到下一个(第一)ILI。该方法是基于在其上用于确定基于可用数据失败的时间相关的概率结构可靠性分析(SRA)。鉴于可用的地面以上的调查数据的数量和质量的是可以使用该方法通过数年的时间延长到下一个ILL。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号