The Miravalles geothermal field has been generating electricity since March 1994. Unit 1 was commissioned in 1994 (55 MWe), a wellhead unit in 1995 (5 MWe), Unit 2 in 1998 (55 MWe) and Unit 3 (27.5 MWe) in 2000. Unit 5, a 15.5 MWe binary plant, is expected to be in commercial operation in January of 2004. With Unit 5, the installed capacity at the Miravalles geothermal field will increase to 158 MWe. ICE went through a bidding process to select the binary plant to be installed at the Miravalles geothermal field. Prior to the final selection, ICE also evaluated in the same bidding process the possibility of building a second-flash station to utilize the residual geothermal fluids. Based on a cost-benefit analysis, ICE chose the binary plant as the best option to generate energy from residual geothermal fluids. The increase in the installed geothermal capacity, the current status of the Miravalles geothermal field and the characteristics of the chosen binary plant are described in the following sections.
机译:自1994年3月以来,Miravalles地热领域一直发电。1册由1994年(55米),1995年(5米),1998年第2册(55 MWE)和第3册(27.5 MWE)和2000年第3册(27.5 MWE)委托(55 MWE)委托。 。第5款,15.5 MWE二进制工厂,预计将于2004年1月在商业运营中。通过单位5,Miravalles地热场的装机容量将增加到158米。 ICE通过竞标过程来选择要安装在Miravalles地热场的二元工厂。在最终选择之前,冰也在相同的竞标过程中评估了建立第二闪存站以利用残留地热流体的可能性。基于成本效益分析,ICE将二元工厂作为从残留地热流体产生能量的最佳选择。在以下部分描述了安装地热容量,Miravalles地热场的当前状态和所选二元植物的特征。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号