The next step in Substation Automation at Pacific Gas Electric-Meeting Standards and Requirements

机译:太平洋燃气和电能满足标准和要求的变电站自动化的下一步

获取原文

摘要

Pacific Gas & Electric (PG&E has completed ten pilot projects during the past four years including the installation of several Modular Protection and Control (MPAC) buildings, Based on the lessons learned, PG&E is moving forward to further refine the engineering design of the MPAC Building projects. In addition the data collection and communication to the switching centers has been reviewed in detail to define the critical data to be shared. The concept of the MPAC building is to provide a highly integrated, well engineered, preassembled control building to site that can be used to retrofit existing substations as well as new substations. The MPAC buildings include a substation automation system within the building to collect information, provide local control and monitoring and communication to the switching centers. Working in partnership with two selected vendors during the initial phase of the project various requirements and necessary standards for automation refinements were clarified. These standards and requirements are currently being used by PG&E to refine future MPAC project designs. PG&E will implement future MPAC projects with these updated designs and standards. PG&E is currently ramping up the number of installed buildings each year to reach a total of 180 buildings over the next ten years. The paper will review the level of substation integration used within the MPAC building. It will also discuss how the initial phase of MPAC building installation helped PG&E develop what specific hardware and engineering details were required to support system operations and system protection. The paper will also discuss how the system automation architecture was simplified within the MPAC building to reduce database complexity, provide faster data updates, and to simplify troubleshooting and testing.
机译:太平洋燃气和电气(PG&E在过去的四年中完成了十个试点项目,包括安装了几种模块化保护和控制(MPAC)建筑,根据所学到的经验教训,PG&E向前发展,进一步改进了MPAC建筑的工程设计项目。此外,还详细审查了与交换中心的数据收集和通信,以定义要共享的关键数据。MPAC建筑的概念是提供一种高度集成,精心设计的,预装的控制建筑物,可以进入现场用于改造现有的变电站以及新变电站。MPAC建筑包括建筑物内的变电站自动化系统,以收集信息,提供当地控制和监控和通信与交换中心。在初始阶段与两个选定的供应商合作工作项目的各种要求和自动化改进的必要标准是cl ified。这些标准和要求目前用于改进未来MPAC项目设计的PG&E。 PG&E将使用这些更新的设计和标准来实施未来的MPAC项目。 PG&E目前每年升高已安装的建筑物数量,在未来十年中达到180座建筑物。本文将审查MPAC建筑内使用的变电站集成水平。它还将讨论MPAC建筑安装的初始阶段如何帮助PG&E开发所需的特定硬件和工程详细信息来支持系统操作和系统保护。本文还将讨论系统自动化架构如何在MPAC建筑物内简化以降低数据库复杂性,提供更快的数据更新,并简化故障排除和测试。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号