Modeling of Earthwork Dynamic Allocation for Rock-fill Dams

机译:岩石填埋水坝土工厂动态分配建模

获取原文

摘要

By analyzing feeding sources and material accepted fields involved in the earthwork allocation for rock-fill dam, a dynamic model of earthwork allocation is set up by incorporating dynamic programming. Dividing filling and excavation process into n steps, functions of allocation costs during each period is defined according to equation of state transitions, on the basis of which the optimization function is formed. Then the sequential method is employed to get the optimized solution. Finally a practical case is studied for application of this model.
机译:通过分析岩石填充大坝接地分配所涉及的饲养源和材料的接受领域,通过合并动态编程,建立了土作分配的动态模型。将填充和挖掘过程划分为N步骤,根据状态转换的等式,根据形成优化功能,定义每个时段期间的分配成本的功能。然后采用顺序方法来获得优化的解决方案。最后研究了这种模型的实际情况。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号