造成建筑项目延误与超支的原因——以马来西亚与巴基斯坦为案例

代理获取

目录

声明

1 Introduction

1.1 Research Background

1.2 Research Significances

1.3 Research Objectives

1.4 Structure of the Thesis

2 Literature Review

2.1 Previous Studies Outline

3 Methodology of the Research

3.1 Relative Importance Index

3.2 Spearman’s Rank Correlation Coefficient Test

3.3 Indexes

3.4 Data Collection

3.5 Demographics

4 Delay Time and Cost Overrun:(A Case Study of Malaysia)

4.1 Introduction

4.2 Analysis

4.3 Spearman’s rank correlation coefficient test

4.4 Causes of Delays Results

4.5 Effects of Delay for Spearman’s rank Correlation

4.6 Results

4.7 Interpretation

4.8 Conclusion from Relative Importance Index Calculation

4.9 Spearman’s rank Correlation Test Results

5 Delay cost and time overrun:(A case study of Pakistan)

5.1 Introduction

5.2 Analysis

5.3 Indexes

5.4 Interpretation

6 Conclusion and Summary

6.1 As per Relative Importance Index Calculations

6.2 As per Severity Index (S.I.%) calculations

6.3 As per Frequency Index (F.I.%) calculations

6.4 As per Importance Index (ImPI%)

6.5 Limitations

6.6 Recommendations

6.7 Recommendations for Future Studies

参考文献

Appendix A (Questionnaire)

Appendix B (Questionnaire)

Research Projects and Publications in Master Study

致谢

展开▼

著录项

  • 作者

    Muhammad ILYAS;

  • 作者单位

    大连理工大学;

  • 授予单位 大连理工大学;
  • 学科 Civil Engineering Management
  • 授予学位 硕士
  • 导师姓名 Li Jing;
  • 年度 2020
  • 页码
  • 总页数
  • 原文格式 PDF
  • 正文语种 chi
  • 中图分类 TU7F40;
  • 关键词

相似文献

  • 中文文献
  • 外文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号