首页> 中文期刊> 《水利与建筑工程学报》 >高墩大跨连续刚构桥悬臂施工过程中的预拱度设置研究

高墩大跨连续刚构桥悬臂施工过程中的预拱度设置研究

         

摘要

Here ,the main factors influencing the bridge deflections were analyzed in construction progress .According to the theoretical calculation method of bridge structure ,the deflection calculation formula of bridge was obtained under cor-responding loads ,and then was applied in the bridge deflection calculation of different construction phases .The construc-tion alignment of the bridge was controlled by setting corresponding prestressing cambers .Finally through the example of practical engineering ,the rationality of setting prestressing cambers was validated .This result will provide the theoretical base for setting reasonable prestressing cambers of similar bridge engineerings .%分析了在悬臂浇筑施工过程中影响梁体挠度的主要因素,根据桥梁结构理论计算方法,得出了在相应荷载作用下挠度的计算公式,对各施工阶段的梁体挠度进行合理的计算,再通过设置相应的预拱度,控制桥梁的施工线形。最后通过实际工程算例,证明了此方法设置预拱度的合理性,为以后同类桥梁的预拱度设置提供依据。

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号