向家坝水电站坝基渗控体系设计与动态优化调整

         

摘要

The engineering geology and hydrogeology at dam site of Xiangjiaba Hydropower Station is complex , and the prob-lems of strong permeable rock mass and seepage stability are serious , so the seepage control treatment of dam foundation is the key of the construction .We proposed several measures , such as the deep curtain and shallow drainage measures , the cutting wall at dam foundation as well as the composite grouting at some key parts , so as to form an integrated seepage control system;some dynamic optimization and adjustment schemes are adopted in the construction process .The monitoring data after impoundment show that the optimized design is obviously effective , which ensured the impoundment safety .%向家坝水电站坝址区工程地质水文地质条件复杂,岩体透水性强,渗漏及渗透稳定问题突出,因而坝基渗控处理成为工程建设的重点和难点。为此,通过采用深帷幕、浅排水、设置坝基防渗墙,以及对关键部位进行复合灌浆等措施,形成了完整的坝基渗控体系;在施工过程中采用动态设计优化和调整方案,蓄水后监测成果表明,优化调整措施成效明显,保证了大坝正常蓄水安全。可为类似砂岩地区的渗控工程设计与施工提供有价值的参考。

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号