Investigating Causes of Construction Delay in Ethiopian Construction Industries

机译:埃塞俄比亚建筑业施工延误的调查原因

获取原文
       

摘要

Construction delays are occurring in every phase of a construction project and are common problems in construction projects in Ethiopia. Moreover, it is well known that the delays in construction projects are the major causes of project failure. If the delay is not identified and the corrective project management decision is not taken in time a project may incur extra cost and extension of project time, which gives rise to dissatisfaction to all the parties involved and nowadays it’s becoming a major obstruction for their development for developing countries like Ethiopia. This research first identified 88 key factors causing delay in Ethiopian construction industries, and then the most common and critical causes of construction delay were evaluated by using both the data collected in a survey of construction managers, resident engineers, contractors, and clients, and interviews with senior professionals in the field. The findings show that the main critical factors that cause construction delays in Ethiopia are: (1) Difficulties in financing project by a contractor; (2) Escalation of the materials price; (3) Infective project planning; (4) Scheduling or resource management; (5) Delay in progress payments for completed works, (6) Lack of skilled professionals in the field of construction management in the organization, and (7) Fluctuating labor availability season to season /Seasonal labors availability. This study shows that in Ethiopia only 8.25% projects have been finished to the original targeted completion date. The remaining 91.75% delayed 352% of its contractual time. This paper finally came up with solutions towards reducing the impact of delays on construction projects in Ethiopia.
机译:建设工程的每个阶段都会出现施工延误,这是埃塞俄比亚建筑工程中的常见问题。此外,众所周知,建设项目的延误是项目失败的主要原因。如果没有发现延迟,并且没有及时采取纠正性的项目管理决定,则项目可能会导致额外的成本和项目时间的延长,这会引起所有相关方的不满,如今,它已成为其发展的主要障碍。埃塞俄比亚这样的发展中国家。这项研究首先确定了导致埃塞俄比亚建筑业延迟的88个关键因素,然后使用对建筑经理,驻地工程师,承包商和客户的调查以及访谈中收集的数据,评估了导致建筑延迟的最常见和关键原因。与该领域的高级专业人员。调查结果表明,造成埃塞俄比亚工程延期的主要关键因素有:(1)承包商在融资项目上的困难; (2)材料价格上涨; (3)传染性项目规划; (四)日程安排或资源管理; (5)延迟完成工程的付款,(6)组织中建筑管理领域缺乏熟练的专业人士,以及(7)各个季节/季节的可用劳动力变动情况。这项研究表明,在埃塞俄比亚,只有8.25%的项目已经完成到最初的目标完成日期。剩余的91.75%延迟了其合同时间的352%。本文最后提出了解决方案,以减少延误对埃塞俄比亚建筑项目的影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号