...
【24h】

Interview

机译:面试

获取原文
获取原文并翻译 | 示例
           

摘要

A number of key Malaysian Army procurement programmes have been postponed to the timeframe of the 10th Malaysia Plan (2011-2016) due to the Malaysian government's need to deal with the global financial crisis. However, according to Malaysian Army Chief General Tan Sri Muhammad Ismail Jamaluddin, this situation is understandable and the Malaysian Army continues to modernise. "We have to bear in mind the global financial crisis and would it be proper for us to spend a large amount of money on weapons when there is a need for money to be spent to offset the effects of the crisis?" Gen Tan Sri Ismail said. Among the programmes postponed were the 8×8 armoured fighting vehicle (AFV) replacement for the army's Sibmas and Condor armoured personnel carriers (APCs), the army's self-propelled artillery system programme and the replacement for the army's Star-burst manportable surface-to-air missile system.
机译:由于马来西亚政府需要应对全球金融危机,许多重要的马来西亚陆军采购计划已被推迟到第十个马来西亚计划(2011-2016年)的时间表。但是,据马来西亚陆军总司令丹斯里·穆罕默德·伊斯梅尔·贾马鲁丁说,这种情况是可以理解的,马来西亚陆军正在继续现代化。 “我们必须牢记全球金融危机,当需要花钱抵消危机的影响时,在武器上花费大量资金是否合适?”丹斯里·伊斯梅尔将军说。被推迟的计划包括为陆军的Sibmas和Condor装甲运兵车(APC)更换8×8装甲战车(AFV),陆军的自行火炮系统计划以及陆军的“星爆”可携带水面飞机空中导弹系统。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号