...
首页> 外文期刊>World of mining-surface & underground >Geomechanics in the opencast mine of the Rhenish lignite mining area--practical application of fundamental soil-mechanical research on a large scale
【24h】

Geomechanics in the opencast mine of the Rhenish lignite mining area--practical application of fundamental soil-mechanical research on a large scale

机译:Rhenish褐煤矿区露天矿中的地质力学-大规模基础土壤力学研究的实际应用

获取原文
获取原文并翻译 | 示例
           

摘要

Compared with the civil engineering sector, lignite mining in the Rhenish mining area with depths of more than 350 m has a "special status" in that it often goes beyond the usual application fields of calculation methods. In the opencast mines of the Rhenish mining area lignite is extracted using continuous opencast mining systems (bucket wheel excavators - belt conveyors - spreaders) with maximum system dimensions of 240,000 m~3+t per day being used. In 2008, 11 km of rim slopes (these will be overturned again following extraction), 375 km of operational slopes and 245 km of dumping slopes were created by main mine equipment in the three opencast mines.
机译:与土木工程部门相比,Rhenish矿区深度超过350 m的褐煤开采具有“特殊地位”,因为它通常超出了计算方法的常规应用领域。在Rhenish矿区的露天矿中,使用连续露天采矿系统(斗轮挖掘机-带式输送机-摊铺机)提取褐煤,最大系统尺寸为每天240,000 m〜3 + t。 2008年,三个露天矿的主要矿山设备创造了11 km的边坡(开采后将被再次倾覆),375 km的作业坡和245 km的倾卸坡。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号