Reducing Risk of a Recovery Schedule Through Resource Loading

机译:通过资源加载降低恢复计划的风险

获取原文
获取原文并翻译 | 示例
           

摘要

Delays are unavoidable caveats that most construction projects face. Some unfortunate projects experience extensive delays that cause the schedule to slip well beyond the baseline completion date and there is no realistic chance of completing the project on-time. For these unfortunate projects, the schedule is often revamped in conjecture with one or multiple schedule acceleration strategies to create a recovery schedule in order to minimize the effects of the delays which often affix liquidated damages. Accelerating the schedule inevitably increases the risk to the project; although, there are alternative measures that can be taken to ensure the recovery schedule has the highest probability of success. Resource loading can provide realistic duration analysis, resource limits, and productivity factors. By integrating the information extracted through the resource-loading process, the recovery schedule becomes more precise. This article describes the use of resource-loading (labor hours) for a recovery schedule in order to minimize the risk to the project while significantly increasing the chances of successfully achieving the completion date.
机译:拖延是大多数建筑项目不可避免的警告。一些不幸的项目会经历大量的延迟,从而导致进度表大大超出了基线完成日期,并且没有按时完成项目的实际机会。对于这些不幸的项目,通常会根据一种或多种进度加速策略来修改进度表,以创建恢复进度表,以最大程度地减少通常贴有违约金的延误的影响。加快进度不可避免地增加了项目的风险;但是,可以采取其他措施来确保恢复计划具有最大的成功可能性。资源加载可以提供实际的持续时间分析,资源限制和生产率因素。通过整合通过资源加载过程提取的信息,恢复计划变得更加精确。本文介绍了如何将资源加载(工作时间)用于恢复计划,以最大程度地降低项目风险,同时显着增加成功实现完成日期的机会。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号