Last Planner System and the Construction Project Schedule

机译:最后一个计划系统和建设项目时间表

获取原文
获取原文并翻译 | 示例
           

摘要

This practical applications paper investigates how construction projects can implement the Last Planner System and maintain an accurate contractual project schedule. A brief overview and implementation strategy of the Last Planner System as a Lean construction management tool is provided. Steps for establishing and maintaining an accurate schedule while aligning Last Planner System planning information with the master schedule are discussed. Project planning benefits of embracing the entire Last Planner System includes increasing buy-in from stakeholders, regular monitoring of a schedule, and maintenance of the construction plan. This paper uses actual projects as references, and Primavera P6 as the software application.
机译:本实际应用文件调查了建设项目如何实施最后一个策划系统并维持准确的合同项目时间表。 提供了最后一个计划系统作为精益施工管理工具的简要概述和实施策略。 讨论了在对齐与主表中的最后一个规划系统规划信息的同时建立和维护准确计划的步骤。 项目规划福利拥有整个最后一个计划系统,包括增加利益相关者的买入,定期监测建筑计划的时间表和维护。 本文使用实际项目作为参考,并作为软件应用程序的Primavera P6。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号