Welsh ministers have accepted therecommendation of their inspector to grantpermission for a nationally significantpower generation proposal in south Wales,concluding that it would be suitably locatedand would bring economic and social benefits.The development comprised the retentionof an existing 20-megawatt electricity-generation operating reserve facility with10 generating engines within containers,associated switchgear, site access andboundary treatment. Ancillary plant andequipment was also proposed, including theinstallation of selective catalytic reductionunits. The standby facility would support thenational grid and the site had been selectedfor its proximity to an existing substation.
机译:威尔士部长们接受了对南威尔士州国家重大发电提案的督察的督察,得出结论认为将适当地定位,将带来经济和社会效益。发展包括现有20兆瓦电力发电经营储备设施保留 用10个在容器中产生引擎,相关的开关设备,站点访问和乐存处理。 还提出了辅助植物和设备,包括选择性催化催化剂的阻力。 备用工具将支持此网格,并选择该网站的邻近对现有变电站。

著录项

  • 来源
    《Mineral Planning》 |2020年第190期|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 矿物学;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号