首页> 外文期刊>PACE: Process & Control Engineering >Overhauling the Snowy Scheme: Upgrading Australia's Snowy Mountains Hydroelectric Scheme s legacy control and information systems presents challenges on many fronts
【24h】

Overhauling the Snowy Scheme: Upgrading Australia's Snowy Mountains Hydroelectric Scheme s legacy control and information systems presents challenges on many fronts

机译:大雪计划提供:升级澳大利亚的雪山水电方案的遗留控制和信息系统在许多方面提出挑战

获取原文
获取原文并翻译 | 示例
           

摘要

LOCATED in Australia's Southern Alps, the Snowy Mountains Hydroelectric Scheme was built between 1949 and 1974 to realise two vital goals: to provide water for irrigation purposes and also electricity from hydroelectric generation. The waters of the Snowy and Eucumbene Rivers are diverted to the rich farming areas of the Murray-Darling Basin, and pass en-route through the Scheme's two pumping stations and seven hydroelectric power stations.
机译:位于澳大利亚的南部阿尔卑斯山,雪山水电方案建于1949年至1974年,实现了两个重要的目标:为灌溉目的提供水,以及从水力发电的电力。 雪地和巩固河流的水域被转移到默里 - 达令盆地的丰富的农业领域,并通过该计划的两个泵站和七个水电电站来通行。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号