...
首页> 外文期刊>Mining Engineering >El Aguila Tailings Facility--Oaxaca, Mexico
【24h】

El Aguila Tailings Facility--Oaxaca, Mexico

机译:El Aguila尾矿设施-墨西哥瓦哈卡

获取原文
获取原文并翻译 | 示例
           

摘要

Gold Resource Corporation, Denver, Colo., received permits to begin construction of the El Aguila tailings facility located in the southern state of Oaxaca in October 2008 Allan Breintenbach, P.E., senior geotechnical engineer for Vector Engineering Inc., Golden, Colo., specified Firestone's 1.14-mm 45-mil) scrim-reinforced fPP-R Geomembrane for El Aquila tailings facility due to its excellent physical properties The geomembrane was successfully installed onto 40 m (130 ft) deep basin with slope steepness of about 40 percent using a hot wedge weld method. Despite the wet season of Oaxaca, over 60,000 m~2 (about 646,000 ft~2) of fPP-R Geomembrane was installed onto the steep sloped basin of the El Aguila Project without any material bunching or folding at the base.
机译:科罗拉多州丹佛市的黄金资源公司(Gold Resource Corporation)已获得许可,于2008年10月开始在瓦哈卡州南部的El Aguila尾矿设施建设。耐火石的1.14毫米厚45密耳)稀松布增强的fPP-R土工膜,用于El Aquila尾矿设施,由于其优异的物理性能而成功地将土工膜安装到40 m(130 ft)深的盆地上,通过热将其坡度提高约40%楔焊法。尽管瓦哈卡州处于潮湿季节,但仍将超过60,000 m〜2(约646,000 ft〜2)的fPP-R土工膜安装在El Aguila项目的陡坡盆地上,底部没有任何材料聚集或折叠。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号